Results
810 result(s), displaying 733 to 744
South Australia: January - March 2028
On 2 January 2025, the South Australia Minister for Energy and Mining triggered the RRO in South Australia for the first quarter of 2028.
Type
Retailer Reliability Obligation
Status
Current
Ring-fencing guideline (electricity transmission) 2025
The AER has released version 5 of the ring-fencing guideline for electricity transmission.
Type
Ring-fencing
Status
Current
Ring-fencing guideline (electricity distribution) 2025
The AER has released version 4 of the ring-fencing guideline for electricity distribution.
Type
Ring-fencing
Status
Current
Ergon Energy Ring-fencing Waiver - Hayman Island - May 2025
Ergon Energy requested a ring-fencing waiver in order to continue to provide a connection to Hayman Island.
Type
Ring-fencing
Status
Current
Energex - Ring-fencing waiver- six battery energy storage systems - May 2025
Energex is seeking a waiver to install, operate and lease six battery energy storage systems.
Type
Ring-fencing
Status
Open
Ergon Energy - Ring-fencing waiver- six battery energy storage systems - May 2025
Ergon Energy is seeking a waiver to install, operate and lease six battery energy storage systems.
Type
Ring-fencing
Status
Open
Roma (Wallumbilla) to Brisbane Pipeline - Access arrangement 2027–32
Gas access arrangement for Roma (Wallumbilla) to Brisbane Pipeline for the 2027–32 regulatory period
Type
Access arrangements
Status
Open
Ausgrid Community Power Network trial waiver application
Ausgrid’s proposal is the first trial application under the policy-led sandboxing approach launched by the AER in February 2025.
Type
Energy Innovation Toolkit
Status
Open
Essential Energy - Ring-fencing waiver - establishing a training academy in regional NSW
The AER has received a ring-fencing waiver application from Essential Energy to support the establishment of a new training academy.
Type
Ring-fencing
Status
Current
TasNetworks - Legacy Meter Replacement Plan
TasNetworks' Legacy Meter Replacement Plan sets out the planned replacement program for the legacy meters in its network.
Type
Legacy Meter Replacement Plans
Status
Current
Evoenergy - Legacy Meter Replacement Plan
Evoenergy’s Legacy Meter Replacement Plan sets out the planned replacement program for the legacy meters in its network.
Type
Legacy Meter Replacement Plans
Status
Current
Meeting system strength requirements in NSW RIT-T dispute
The Centre for Independent Studies submitted a dispute notice on Transgrid’s Meeting system strength requirements in NSW RIT-T.
Type
RIT-T and RIT-D disputes
Status
Current