Victorian DNSPs – Cost pass through applications – Flexible trading arrangements rule change
Applications are to recover costs incurred due to the flexible trading arrangements rule change. Submissions close 23 January 2026.
Type
Cost pass throughs
Status
Open
Jemena – Cost pass through applications – MITE, ASMD, VEBM2
Jemena submitted applications to recover costs incurred due to various regulatory and service standard change events. Submissions close 23 January 2026.
Type
Cost pass throughs
Status
Open
Energex - Cost pass through application – Tropical Cyclone Alfred
Energex submitted a cost pass through application to recover costs incurred due to Tropical Cyclone Alfred in March 2025. Submissions close 23 January 2026.
Type
Cost pass throughs
Status
Open
Enabling Central-West Orana Renewable Energy Zone Network Infrastructure Project (non-contestable)
Read Transgrid's proposal for the Enabling Central-West Orana REZ Network Infrastructure Project (the CWO Enabling RNIP)
Type
Determinations
Status
Open