Results
776 result(s), displaying 745 to 756
SA Power Networks - Determination 2025–30
SAPN electricity revenue determination for the 2025–30 period.
Type
Determinations
Status
Current
Ergon Energy - Determination 2025–30
Ergon Energy electricity revenue determination for the 2025–30 period
Type
Determinations
Status
Current
Directlink - Determination 2025–30
Directlink electricity revenue determination for the 2025–30 period.
Type
Determinations
Status
Current
Roma North (Mimas) Gas Pipeline classification decision
On 23 July 2025, Stuart Petroleum Cooper Basin Gas Pty Ltd applied for a pipeline classification decision for the Roma North (Mimas) Gas Pipeline.
Type
Determinations
Status
Current
Endeavour Energy Ring-fencing waiver - training services
Endeavour Energy requested a ring-fencing waiver in order to provide training services to Evo Energy through their RTO facilities.
Type
Ring-fencing
Status
Current
Jemena Gas Networks (NSW) - Access arrangement 2025–30
The AER will make a determination on the maximum amount of revenue that Jemena Gas Networks can earn from consumers over the period 1 July 2025 to 30 June 2030.
Type
Access arrangements
Status
Current
Transgrid - Determination 2023–28
Transgrid's current electricity transmission determination applies from 1 July 2023 to 30 June 2028.
Type
Determinations
Status
Current
South Australia: December 2026 - February 2027
On 1 October 2025, AEMO notified the AER that the reliability gap for South Australia from 1 December 2027 to 28 February inclusive had closed.
Type
Retailer Reliability Obligation
Status
Revoked
Energex - Ring-fencing waiver- six battery energy storage systems - May 2025
Energex is seeking a waiver to install, operate and lease six battery energy storage systems.
Type
Ring-fencing
Status
Open
Ergon Energy - Ring-fencing waiver- six battery energy storage systems - May 2025
Ergon Energy is seeking a waiver to install, operate and lease six battery energy storage systems.
Type
Ring-fencing
Status
Open
Ausgrid Community Power Network trial waiver application
Ausgrid’s proposal is the first trial application under the policy-led sandboxing approach launched by the AER in February 2025.
Type
Energy Innovation Toolkit
Status
Open