Results
772 result(s), displaying 745 to 756
CitiPower - Legacy Meter Replacement Plan
CitiPower’s Legacy Meter Replacement Plan sets out the planned replacement program for the legacy meters in its network.
Type
Legacy Meter Replacement Plans
Status
Current
Ergon Energy - Ring-fencing Waiver - Isolated Networks - 2025
The Australian Energy Regulator (AER) is seeking submissions on Ergon Energy’s application to renew its waiver
Type
Ring-fencing
Status
Open
Meeting system strength requirements in NSW RIT-T dispute
The Centre for Independent Studies submitted a dispute notice on Transgrid’s Meeting system strength requirements in NSW RIT-T.
Type
RIT-T and RIT-D disputes
Status
Current
SA Power Networks - Determination 2025–30
SAPN electricity revenue determination for the 2025–30 period.
Type
Determinations
Status
Current
Ergon Energy - Determination 2025–30
Ergon Energy electricity revenue determination for the 2025–30 period
Type
Determinations
Status
Current
Directlink - Determination 2025–30
Directlink electricity revenue determination for the 2025–30 period.
Type
Determinations
Status
Current
Essential Energy - Ring-fencing waiver - establishing a training academy in regional NSW
The AER has received a ring-fencing waiver application from Essential Energy to support the establishment of a new training academy.
Type
Ring-fencing
Status
Open
Roma North (Mimas) Gas Pipeline classification decision
On 23 July 2025, Stuart Petroleum Cooper Basin Gas Pty Ltd applied for a pipeline classification decision for the Roma North (Mimas) Gas Pipeline.
Type
Determinations
Status
Current
Basslink - Determination 2025–30
On 15 September 2023, APA Group submitted additional information in support of the conversion application and a revenue determination proposal.
Type
Determinations
Status
Current
Endeavour Energy Ring-fencing waiver - training services
Endeavour Energy requested a ring-fencing waiver in order to provide training services to Evo Energy through their RTO facilities.
Type
Ring-fencing
Status
Current
Jemena Gas Networks (NSW) - Access arrangement 2025–30
The AER will make a determination on the maximum amount of revenue that Jemena Gas Networks can earn from consumers over the period 1 July 2025 to 30 June 2030.
Type
Access arrangements
Status
Current