Results
793 result(s), displaying 769 to 780
Basslink - Determination 2026–30
On 15 September 2023, APA Group submitted additional information in support of the conversion application and a revenue determination proposal.
Type
Determinations
Status
Current
Sturt Plateau Pipeline classification decision
On 11 February 2026, APA SPP Pty Ltd applied to the AER for a gas pipeline classification decision for the Sturt Plateau Pipeline.
Type
Determinations
Status
Open
APA Victorian Transmission System - Access arrangement 2028–32
Gas access arrangement for APA Victorian Transmission System for the 2028–32 regulatory period
Type
Access arrangements
Status
Open
VIOTAS trial waiver application
The AER is currently considering a trial waiver application from VIOTAS.
Type
Energy Innovation Toolkit
Status
Open
Ausgrid Increased Customer Demand Requirements in the Macquarie Park Area Contingent Project
Ausgrid’s contingent project application requesting a revenue increase to fund its Wallumatta substation.
Type
Contingent projects
Status
Open
Transgrid - Transmission Determination 2028-33
The AER will make a determination of the maximum amount of revenue that Transgrid can earn from customers over the period 1 July 2028 to 30 June 2033.
Type
Determinations
Status
Open
ElectraNet - Transmission Determination 2028-33
The AER will make a determination of the maximum amount of revenue that ElectraNet can earn from customers over the period 1 July 2028 to 30 June 2033.
Type
Determinations
Status
Open
Murraylink - Transmission Determination 2028-33
The AER will make a determination of the maximum amount of revenue that Murraylink can earn from customers over the period 1 July 2028 to 30 June 2033.
Type
Determinations
Status
Open
Powerlink Transmission - Determination 2027-2032
The AER will make a determination of the maximum amount of revenue that Powerlink can earn from customers over the period 1 July 2027 to 30 June 2032.
Type
Determinations
Status
Open
AusNet Services Transmission - Determination 2027-32
On 31 October 2025, AusNet Services submitted its transmission revenue proposal to the AER for the 2027–32 regulatory period.
Type
Determinations
Status
Open
TasNetworks distribution cost pass through application – August-September 2024 storm
AER's decision on TasNetworks' (distribution) September 2024 storm cost pass through application.
Type
Cost pass throughs
Status
Current
Powerlink - Network support pass through 2024-25
The AER has determined Powerlink's 2024-25 positive network support cost pass through should be reflected in Powerlink's maximum allowed revenue for 2026-27
Type
Cost pass throughs
Status
Current