Ausgrid Increased Customer Demand Requirements in the Macquarie Park Area Contingent Project
Ausgrid’s contingent project application requesting a revenue increase to fund its Wallumatta substation.
Type
Contingent projects
Status
Open
Transgrid - Transmission Determination 2028-33
The AER will make a determination of the maximum amount of revenue that Transgrid can earn from customers over the period 1 July 2028 to 30 June 2033.
Type
Determinations
Status
Open
ElectraNet - Transmission Determination 2028-33
The AER will make a determination of the maximum amount of revenue that ElectraNet can earn from customers over the period 1 July 2028 to 30 June 2033.
Type
Determinations
Status
Open
Murraylink - Transmission Determination 2028-33
The AER will make a determination of the maximum amount of revenue that Murraylink can earn from customers over the period 1 July 2028 to 30 June 2033.
Type
Determinations
Status
Open
AusNet Gas Services - Access arrangement 2028–33
Gas access arrangement for AusNet Gas Services for the 2028–33 regulatory control period
Type
Access arrangements
Status
Open
Multinet Gas Networks - Access arrangement 2028–33
Gas access arrangement for Multinet Gas for the 2028–33 regulatory control period
Type
Access arrangements
Status
Open
Australian Gas Networks (Victoria and Albury) - Access arrangement 2028–33
Gas access arrangement for Australian Gas Networks (Victoria and Albury) for the 2028–33 regulatory control period
Type
Access arrangements
Status
Open
Powerlink Transmission - Determination 2027-2032
The AER will make a determination of the maximum amount of revenue that Powerlink can earn from customers over the period 1 July 2027 to 30 June 2032.
Type
Determinations
Status
Open
Powerlink cost pass through application – SoCI Act reforms
On 30 September 2025, Powerlink submitted a cost pass through application seeking to recover the costs it had incurred as a result of the SoCI Act reforms.
Type
Cost pass throughs
Status
Current
AusNet Services Transmission - Determination 2027-32
On 31 October 2025, AusNet Services submitted its transmission revenue proposal to the AER for the 2027–32 regulatory period.
Type
Determinations
Status
Open
System Strength Project (hybrid)
The AER has commenced its assessment of Transgrid’s System Strength Project and will make its final decision on or before 21 October 2026.
Type
Determinations
Status
Open