Results
829 result(s), displaying 805 to 816
Amadeus Gas Pipeline - Access arrangement 2021–26
The AER has concluded its determination on the maximum amount of revenue that Amadeus can earn from consumers over the period 1 July 2021 to 30 June 2026.
Type
Access arrangements
Status
Historical
Australian Gas Networks (SA) - Access arrangement 2021-26
The AER has concluded its determination on the maximum amount of revenue that AGN(SA) can earn from consumers over the period 1 July 2021 to 30 June 2026.
Type
Access arrangements
Status
Historical
Roma (Wallumbilla) to Brisbane Pipeline - Access arrangement 2027–32
Gas access arrangement for Roma (Wallumbilla) to Brisbane Pipeline for the 2027–32 regulatory period
Type
Access arrangements
Status
Open
APA Victorian Transmission System - Rule 80 application for the expansion of the South West Pipeline
APA submitted an application under rule 80 of the NGR seeking an advanced determination for its capital expenditure for the Victorian Transmission System (VTS).
Type
Access arrangements
Status
Open
SA Power Networks - Ring fencing waiver - Market Active Solar Trial - January 2024
SA Power Networks has submitted a waiver application under provision 4.2 of the Ring-fencing Guideline (Electricity distribution)
Type
Ring-fencing
Status
Current
Energex - Ring-fencing waiver- six battery energy storage systems - May 2025
Energex is seeking a waiver to install, operate and lease six battery energy storage systems.
Type
Ring-fencing
Status
Current
Ergon Energy - Ring-fencing waiver- six battery energy storage systems - May 2025
Ergon Energy is seeking a waiver to install, operate and lease six battery energy storage systems.
Type
Ring-fencing
Status
Current
Energex - Ring-fencing waiver - six battery energy storage systems - November 2025
Energex is seeking a waiver to install, operate and lease six battery energy storage systems.
Type
Ring-fencing
Status
Current
Ergon Energy - Ring-fencing waiver - 24 battery energy storage systems - November 2025
Ergon Energy is seeking a waiver to install, operate and lease 24 battery energy storage systems.
Type
Ring-fencing
Status
Current
Sturt Plateau Pipeline classification decision
On 11 February 2026, APA SPP Pty Ltd applied to the AER for a gas pipeline classification decision for the Sturt Plateau Pipeline.
Type
Determinations
Status
Open
Review of the Ring-fencing guideline (electricity distribution) and Shared Asset Guideline
The Australian Energy Regulator (AER) has commenced a review of the Ring-fencing Guideline (electricity distribution) v4 and the Shared Asset Guideline v2.
Type
Ring-fencing
Status
Current
Ausgrid Increased Customer Demand Requirements in the Macquarie Park Area Contingent Project
Ausgrid’s contingent project application requesting a revenue increase to fund its Wallumatta substation.
Type
Contingent projects
Status
Open