SA Power Networks - electricity distribution network

Sector: 
Segment: 
Owner: 
Cheung Kong Infrastructure/Power Assets 51%, Spark Infrastructure 49%
Operator: 
SA Power Networks
Covered by regulation: 
Yes
Source: 
State of the Energy Market 2014

Notes

Current regulatory period: 1 July 2010 - 30 June 2015

On 3 September 2012, ETSA Utilities changed its name to SA Power Networks - all other details remain unchanged.

Customer numbers Line length (km) Maximum demand (MW) 2012-13 Asset base June 2013 ($million)
847 766 87 883 2 915 3 469